1  ·  Executive summary

PMO Director · Carla Oliver

Final Steerco of Phase 1, held two weeks ahead of G4 cutover so the 14-day fortnightly cadence is preserved end-to-end and the gap to G4 is used for sign-off paperwork rather than meeting prep. G4 cutover review against Implemented criteria for all seven workstreams. WS6 Vertical-1 live with first 100 referrals through the chain — transitions to Implemented. WS3 transitions to Implemented as Phase 2 BAU coaching begins. WS4 counsel operating as fractional resource — transitions to Implemented. Phase 2 Schedule presented for signature, anchored to the FY27 budget Carla built during Phase 1 and the Investor Pack trajectory. Decision: sign Phase 2 Schedule by 24 Aug, commence Phase 2 from 1 September 2026.

1b  ·  Bottom-up status reports for this Steerco

No bottom-up evidence-based workstream status reports compiled for this Steerco. The PMO publishes these approximately 5 working days ahead of each meeting where a workstream needs to surface evidence vs target ahead of decisions.

2  ·  Workstream snapshot · at meeting

Position of every workstream on the four-state lifecycle as of this Steerco. Note: the data model on this site reflects the engagement-signing baseline — actual fortnightly transitions will be reflected here as they happen in Phase 1.

WSTitleLead/ProviderMaturity
WS1 Marketing & Digital Acquisition Corrina McGowan
YDT
Implemented
WS2 Commission Engine Carla Oliver
CoSai
Implemented
WS3 Founder Capability Mathew Punter (coachee)
CoSai
Scoped
WS4 Legal & Corporate Structure TBA
CoSai
Scoped
WS5 Platform Engineering & Data AI-augmented workforce
CoSai
Absorbed by design
WS6 Vertical Partnerships & BDM TBA
CoSai
Built
WS7 Investor Relations & Capital Strategy Carla Oliver (CFO hat — separable from CoSai retainer hat)
CoSai
Implemented

3  ·  Maturity transitions · since last Steerco

No state transitions in this period. Workstreams operating against milestone plan.

4  ·  Milestones · review at this meeting

WSWeekMilestoneTriggers
WS1 W12 FY27 KPI lock for Phase 2 Schedule signing · WS1 operates continuously into Phase 2 No state change
WS2 W12 Platform handover-ready for Phase 2 BAU operation · FY27 budget ratified for KPI lock No state change
WS3 W12 WS3 enters Phase 2 with curriculum live · ongoing coaching as BAU → Implemented
WS4 W12 Counsel embedded as fractional BAU resource · WS4 transitions to Implemented at G4 → Implemented
WS6 W12 Vertical-1 live · first 100 referrals through the chain · WS6 transitions to Implemented at G4 → Implemented
WS7 W12 Phase 1 raise window closes 31 Aug 2026 · WS7 transitions to Phase 2 active raise execution No state change

5  ·  Decisions today · awaiting Client sign-off

No decisions tabled at this meeting. Operating cadence only.

6  ·  RAID · amber & red escalations

IDTypeSeverityWSTitle & mitigationOwner
R001 Risk Amber WS4 Fractional counsel engagement timing — must land by Steerco #3
Three candidates engaged early; recommendation tabled at Steerco #2
Carla (PMO)
R002 Risk Amber WS6 Senior BDM appointment timing — Vertical-1 partner conversations dependent on BDM seat being filled
PMO holds partner conversations until BDM appointed; shortlist narrowed at Steerco #2
Carla (PMO)
A006 Assumption Amber WS2 Compliance gate default checklist: claims-substantiated · disclosure-present · brand-approved · legal-cleared
Settings → Compliance Gates exposes per-asset-type checklist. Corrina + counsel ratify the production set at Steerco #3 before any /crm/* compliance gate goes live. Demo uses 4-default seed.
Corrina (consulted) · Carla (accountable)
A007 Assumption Amber WS2 Cooling-off period defaults to 14 days, vertical-agnostic
Settings → Cooling-off exposes per-vertical / per-commission-type duration. Demo seeds 14 days flat; Matt ratifies vertical-specific durations at Steerco #3 before commission engine production cutover.
Matt (consulted) · Carla (accountable)
A008 Assumption Amber WS2 Commission base rate placeholder 10% until Matt-signed policy lands
Settings → Commission Engine exposes per-vertical rate + tiered structure (volume / tenure / mix bonus). Demo seeds 10% flat placeholder. Production /me/commissions/* gated until Matt-signed policy is loaded into config_commission_policy.
Matt (consulted) · Carla (accountable)
A015 Assumption Amber WS2 Sales-internal + CS suite embodiers TBA until Phase 2 BAU hires
Phase 1 demo uses TBA placeholders. Settings → Roles & Access allows assignment of real users to Sales / CS roles once Phase 2 BAU hires land. No code change.
Carla (WS2 Lead)
R003 Risk Amber WS2 Settings versioning + retroactive recalc risk on commission engine
Commission policy changes must be effective-dated, never retroactive without explicit recalc approval. Historical commission records carry the policy-version they were calculated against. Dry-run preview before save shows "would change N commissions, total $X delta".
Carla (WS2 Lead)
R004 Risk Amber WS2 Misconfigured Settings could break commission engine or compliance gate
Settings admin permission gated to specific roles (CFO + Compliance Officer). Financial-rule changes require dual sign-off. All changes audited with before/after diff. Recovery: every settings row versioned, one-click revert.
Carla (WS2 Lead)
D002 Dependency Amber WS2 Final commission policy from Matt before /me/commissions/* production cutover
Demo seeds 10% placeholder. Production /me/commissions/* blocked until Matt-signed policy loaded into config_commission_policy. Settings → Commission Engine exposes the editor; Matt completes by Steerco #3.
Matt (consulted) · Carla (accountable)
D003 Dependency Amber WS2 AU regulatory clearance on member-side commission framing (AFSL / AUSTRAC / consumer law)
Counsel-engaged sprint Steerco #2 → #3 covers AFSL applicability for referral payments, AUSTRAC AML/CTF for member payouts, ACL disclosure obligations. /me/commissions/* + /crm/compliance/* surfaces parameterised by counsel-ratified rules in Settings.
Compliance (Pine Lawyers, consulted) · Carla (accountable)
I001 Issue Amber WS2 Architectural pivot — /crm-demo/* must be a working CRM tool, not a styled walkthrough
Decision D-PIVOT-CRM (Carla, 2026-06-24): /crm-demo/* refactored from visual narrative pages to a real three-pane CRM workspace backed by D1. New schema (migration 0003): contacts, deals, activities, tickets, notes, settings_rows. Sarah Chen + 24 demo contacts seeded. BD/Sales/CS/CMO workspaces share contact data so the cross-role thread is real, not narrated. Pipeline kanban actually drags; settings actually edit; cooling-off change actually propagates. Demo data only — /crm-demo/* gate held; /crm/* untouched. Resolves the risk Matt and Corrina decline sign-off on a visual mock.
Carla (WS2 Lead) · Claude (build)

7  ·  Forward look · the next two weeks

G4 cutover · 31 Aug 2026

This is the final Steerco of Phase 1. At G4 cutover all on-ladder workstreams must be at Implemented. Phase 2 Schedule is signed by this meeting and commences 1 September 2026 as BAU.