Flip 360 Commission Platform
Workstream Drill-down · WS4 of 7

WS4 · Legal & Corporate Structure.

Lead: TBA · fractional counsel  ·  Provider: CoSai  ·  Current state: Scoped

Live board Workstream ops Registers Steerco papers Scoping · CRM CRM · user requirements Deal room Hardening backlog Learn (ADKAR) Framework
WS1WS2WS3WS4WS5WS6WS7
Source Vol 4 Ch 12 · PMO Structure · the six workstreams  |  Vol 4 Ch 13 · Engagement Terms & Ways of Working

1  ·  Current state & lifecycle

Scoped · Work defined: what gets built, by whom, by when, to what acceptance test.
Pending
Scoped
Built
Live

2  ·  Transition history

Every state transition this workstream has made. Each row carries the trigger event that caused the transition — the single sentence that justifies the state change.

DateTransitioned toTrigger
1 March 2026 Pending scope Workstream named in Vol 4 Ch 12
23 May 2026 Scoped Engagement legal instruments live (/engage T&Cs, sow-ydt T&Cs, framework §7 termination, §8 precedence, §7.4 IP); broader counsel scope defined but not yet engaged

3  ·  PMO commentary

PMO Director · Carla Oliver · WS4

WS4 has a strange shape — the legal instruments for the engagement itself are already Implemented (look at /engage, the sow-ydt T&Cs, framework §7 + §8), but the broader counsel scope (SaaS terms, employment contracts, capital-raise docs) is Scoped not Built. So the workstream is Scoped overall — the engagement architecture is legally solid, the operating business needs counsel formalisation. Phase 1 work is counsel engagement by Steerco #3, scope-locking by Steerco #4, and standard SaaS instruments drafted by week 9. The state transition Scoped→Built happens at week 9. Built→Implemented at G4 when counsel is operating as a fractional BAU resource.

4  ·  Phase 1 / Phase 2 deliverables

Phase 1 · 1 Jun → 31 Aug 2026

Fractional counsel engaged by Steerco #3. Standard SaaS T&Cs, member terms, privacy register, employment contract templates drafted by week 9. Insurance bound. Capital-raise documentation framework ready for Series Seed close.

Phase 2 · 1 Sep 2026 → 30 Jun 2031

Counsel operates as embedded fractional BAU resource. Reviews vertical-partner MoUs as WS6 onboards each new vertical. Drafts and refines capital-raise documentation as WS7 progresses through Seed → A → B.

5  ·  Phase 1 milestones

The build-out plan for this workstream across the 13-week Phase 1. Each row reviewed at the relevant Steerco. Where the milestone triggers a state transition, the new state is shown.

WeekSteercoMilestoneMoves WS to
W2 #1 Counsel shortlist · 3 fractional counsels engaged for capability discussion No state change
W6 #3 Counsel engaged · scope of standard SaaS T&Cs, employment contracts, capital-raise docs locked No state change
W9 #4 Standard SaaS T&Cs drafted · privacy register live · insurance bound → Built
W12 #6 Counsel embedded as fractional BAU resource · WS4 transitions to Implemented at G4 → Implemented

6  ·  KPI architecture

KPI categoryLegal-event delivery (binary · audit-clean)
ExamplesAudit-clean operations · capital raise documentation complete · zero legal blockers to Series Seed close
Volume / Chapter sourceVol 1 Ch 2 (Document governance) + Vol 3 Ch 1-4 (T&C architecture · IP regime)

7  ·  Cross-workstream interfaces

How this workstream supplies and consumes from the other six. Reading these interfaces is how you read the operating model end-to-end.

PartnerSupplies to partnerConsumes from partner
WS2 SaaS T&Cs · member terms · privacy policy · data-processing agreements
WS6 Partner MoUs · vertical-onboarding agreements · referral-partner T&Cs
WS7 Capital-raise documentation · SAFE notes · shareholder agreements · employment contracts for hires

8  ·  Physical artefacts in the repo

Every artefact that exists today as evidence this workstream is at the claimed maturity. 4 routes.

RouteDescription
/engage 12 T&Cs · IP assignment on payment · counterparts clause · canonical Phase 1 CoSai instrument
/engagement/sow-ydt Symmetric T&Cs for YDT · pre-signed by Corrina
/engagement/framework#sec7 §7 Termination & walk-away · §7.4 IP ownership regime
/engagement/framework#sec8 §8 Document hierarchy & precedence · 5-row order

9  ·  Bottom-up evidence-based status reports

No bottom-up status reports have yet been compiled for WS4. The PMO authors these approximately 5 working days ahead of each Steerco — see the WS2 example at /engagement/pmo/ws-status/WS2/2 for the format Carla and the workstream leads use.


WS3 Live PMO board Framework §3 block WS5