Flip 360 Commission Platform
Workstream live ops · WS6 of 7

WS6 · Vertical Partnerships & BDM · live ops.

Lead: TBA · senior BDM  ·  Provider: CoSai  ·  Current state: Built  ·  Health: Amber

Live board Workstream ops Registers Steerco papers Scoping · CRM CRM · truth doc CRM · features map CRM design · Contact 360° Deal room Hardening backlog Learn (ADKAR) Framework
WS1WS2WS3WS4WS5WS6WS7
As of 17 June 2026 · Reported by Carla Oliver (WS6 Lead) · pending BDM appointment
Structural drill-down Live board

1  ·  Done · Doing · Next

The fortnight rhythm. Refreshed by the WS Lead each Steerco. This is the artefact Steerco reads to know what happened, what's happening, and what's next — without having to read the whole backlog.

Done · last fortnight
BDM shortlist narrowed to 2 + Vertical-1 partner identified
  • BDM candidate shortlist narrowed from 6 → 2 across two rounds of interviews
  • Preferred candidate identified, second-round interview with Mathew complete
  • Vertical-1 primary partner candidate identified (D103 pending SC#1 sector lock)
  • Early conversation with Vertical-1 candidate held by Carla
Doing · this fortnight
BDM offer + Vertical-1 sector lock
  • WS6-B001 — BDM offer letter being prepared · status: review · 80% complete
  • Vertical-1 sector lock awaiting D103 sign-off at SC#1
  • Reference checks on BDM preferred candidate complete
Next · upcoming fortnight
BDM appointed + MoU drafted + first referrals
  • WS6-B002 — Vertical-1 partner MoU drafted by counsel + signed · target SC#4
  • WS6-B003 — Onboarding playbook locked · target SC#4
  • WS6-B004 — First referrals flowing through chain · target SC#5
Health · Amber
Amber until BDM signs and Vertical-1 sector is locked. Both items expected resolved within 5 working days post SC#1.

2  ·  This week · Mon 22 June → Sun 28 June

The Mon-Sun sprint. Items pulled from the backlog into active work for this 7-day window. 1 item in sprint.

WS6-S001 · WS6-B001
P0 In sprint
Senior BDM appointment
Owner Mathew + Carla
Days in 9d
Days left 4d
90% complete

3  ·  Backlog · 4 items

Everything on the runway for WS6, grouped by status. Each item has an owner, an effort estimate, a target Steerco, and an acceptance test (the single sentence that defines "done").

In sprint 1 item

WS6-B001
P0 Partner In sprint
Senior BDM appointment
Per Steerco #1 decision D103. Senior BDM appointment is the precondition for Vertical-1 partner conversations. Shortlist narrowed to 2; preferred candidate identified.
Owner Mathew + Carla
Effort 3d
Raised 8 June
Target SC#2 (22 June)
Acceptance test BDM signs employment letter + announced internally + LinkedIn updated.

Backlog 3 items

WS6-B002
P0 Partner Backlog
Vertical-1 partner MoU drafted by counsel + signed
Counsel drafts the Vertical-1 partner MoU using the approved template. BDM walks the MoU through with target partner; partner signs.
Owner Senior BDM + counsel
Effort 8d
Raised 8 June
Target SC#4 (20 July)
Blocked by WS6-B001
Acceptance test Counter-signed MoU on file + partner row in /app/contacts with PARTNER type.
WS6-B003
P1 Governance Backlog
Vertical-1 partner onboarding playbook locked
BDM authors the onboarding playbook: first 90 days with a partner, what we supply, what they supply, success metrics, escalation paths.
Owner Senior BDM
Effort 4d
Raised 8 June
Target SC#4 (20 July)
Acceptance test Playbook published on /pr-media-marketing/partner-onboarding + signed by Mathew.
WS6-B004
P1 Evidence Backlog
First referrals flow through chain from Vertical-1
Vertical-1 partner refers first members through the platform; referrals show up in /chain with attribution to partner; first commission accrues.
Owner Senior BDM
Effort 2d
Raised 8 June
Target SC#5 (3 Aug)
Acceptance test /chain shows at least 5 referrals attributed to Vertical-1 partner + commission_rules row triggered.

4  ·  RAID · WS6 open items

Open Risks, Assumptions, Issues, Dependencies attributed to WS6. Closed items hidden — see the full RAID register filtered to WS6.

IDTypeSeverityTitleOwner
R002 Risk Amber Senior BDM appointment timing — Vertical-1 partner conversations dependent on BDM seat being filled
PMO holds partner conversations until BDM appointed; shortlist narrowed at Steerco #2
Carla (PMO)
D001 Dependency Green WS4 partner MoU template required before Vertical-1 MoU can be drafted
Counsel engagement at Steerco #3 unblocks MoU drafting by Steerco #4
Carla (PMO)

5  ·  Steerco decisions referencing WS6

D103 · SC#1
Pending
Confirm Vertical-1 partner target sector
WS6 BDM shortlist needs partner sector locked to brief candidates correctly

6  ·  Quick links

Structural drill-down (lifecycle, transitions, artefacts) All registers ADKAR learn pack Live PMO board
Source Vol 1 Ch 10 · The Future-State PMO  |  Vol 4 Ch 12 · PMO Structure · the six workstreams